Demolition

Projects

Resurfacing & Related Work Along Route 28

Location: Cambridge-Somerville

Project Value: $15M

Owner: MassDOT

Overview:SPS New England is currently performing the following scopes of work along a 1-1/2 mile stretch of Route 28 between 3rd Street in Cambridge and Broadway Street in Somerville: Bridge Deck, Scupper & Joint Repairs on Two Bridges over the MBTA Green Line & Keolis Commuter Rail Reconstruction of Deteriorated Bridge Barrier Curbing & Sidewalk MORE >

Services:

Logan Airport – Terminal C Roadways

Location: Logan International Airport

Project Value: $66M

Owner: Massachusetts Port Authority

Overview:Joint Venture with Bond Civil & Utility of Medford, MA. Demolition of the existing lower (Arrivals) level between Terminals A and C, and reconstruction of three new Arrivals level roadways. Reconstruction of the Terminal B parking garage exit roadway, construction of a new roadway from Terminal B arrivals level curbside pickup exit, and construction of MORE >

Services:

Logan Airport – Terminal B Roadways

Location: Logan International Airport

Project Value: $34M

Owner: Massachusetts Port Authority

Overview:Reconstruction of the existing roadways to Terminal B passenger curbside pick-up and garage at both the upper (Departures) and lower (Arrivals) levels, including the main Terminal Area Roadways at both levels in advance of Terminal B. Reconstruction of the arrivals level entrance roadways and construction of one new underpass (tunnel) parallel to Terminal A, and MORE >

Services:

Dedham Street I-95 Interchange

Location: Canton-Norwood-Westwood

Project Value: $45M

Owner: MassDOT

Overview:The project consists of widening Dedham St from a two lane roadway to four travel lanes (two in each direction), with a sidewalk and bike lanes, and constructing an off-ramp from I-95 NB to Dedham St. The project includes a full bridge replacement of Dedham St over I-95, bridge widening of the Dedham St bridge MORE >

Services:

Dalton Street over I-90

Location: Boston, MA

Project Value: $16M

Owner: City of Boston

Overview:The scope of work includes full concrete bridge deck replacement of the Dalton St Bridge over I-90, MBTA, and Cambria Street in Boston MA in (2) two phases over a project duration of 18 months. Work includes: Demolition of concrete bridge deck Cleaning and painting of all structural steel girders Replacement of all bridge bearings MORE >