Project Overview
SPS replaced the deteriorated and damaged superstructure, raised the bridge profile and extended existing wingwalls and abutments.
Key Challenges
- SPS used self-propelled Modular Transporters to replace the bridge superstructure
- This project was MassDOT’s first heavy-lift Design-Build project