Bridge Reconstruction – Rte. 2 over Rte. 2A

Project Overview

SPS replaced the deteriorated and damaged superstructure, raised the bridge profile and extended existing wingwalls and abutments.

Key Challenges

  • SPS used self-propelled Modular Transporters to replace the bridge superstructure
  • This project was MassDOT’s first heavy-lift Design-Build project
    • SPS new england, inc.  |  
    • 98 elm street   |  
    • salisbury, MA 01952   |  
    • (978) 462-6543     
  • © 2024 SPS New England, Inc. All Rights Reserved. | Website developed by Siphon Marketing