Project Overview
This interchange reconstruction project included six (6) bridge replacements with median crossovers including one temporary Acrow bridge.
Services Performed
- Installed steel H Piles, concrete footings at abutments and piers
- Installed steel superstructures and concrete bridge decks with parapets and safety features
- Full Highway reconstruction from subgrade up.
- Full paving, and installation of highway lighting, drainage, guide signs and safety features
Successful Results
SPS used accelerated operations to gain back one full year on the schedule that was lost due to fiber optic relocations.