Resurfacing & Related Work Along I-93

This project includes bridge and highway maintenance as well as highway resurfacing along a 2.5 mile stretch of one of the most heavily-travelled sections of I-93 in Boston and Milton. Bridge maintenance work includes concrete parapet repairs, bridge deck repairs, bridge membrane replacement and joint replacement on three bridges. Highway work includes guardrail repairs, drainage maintenance/repairs and full-width milling & paving of I-93, including the HOV lane.

    • SPS new england, inc.  |  
    • 98 elm street   |  
    • salisbury, MA 01952   |  
    • (978) 462-6543     
  • © 2024 SPS New England, Inc. All Rights Reserved. | Website developed by Siphon Marketing