Rte. 24 Exit 8B Interchange – Design-Build Construction
Project Overview
SPS performed Design-Build construction of a new interchange including a 190 foot bridge over Route 24 and relocation of approximately 2,000 feet of South Main Street adjacent to the interchange area.
Services Performed
The work also included construction of:
A wildlife crossing under Route 24
A pedestrian underpass
A number of retaining walls, storm water wetlands and traffic signals.