Project Overview
SPS successfully reconstructed this busy interchange, including replacement of 2 bridges at Route 2 over I-95 (Rt 128).
Services Performed
- Erected a precast concrete modular bridge abutment on concrete leveling slab footing, with a cast in place concrete pier on concrete drilled shafts
- Constructed a steel superstructure with concrete bridge deck, parapets and safety features
- Performed full highway reconstruction on Route 2 and I-95, precast concrete median barrier and improved ramp geometry
- Upgraded drainage, including new storm water treatment basins