SPS specializes in all types of bridge construction, from simple span bridges over land to complex movable span bridges over deep water.
Location: Cambridge-Somerville
Project Value: $15M
Owner: MassDOT
Overview:SPS New England is currently performing the following scopes of work along a 1-1/2 mile stretch of Route 28 between 3rd Street in Cambridge and Broadway Street in Somerville: Bridge Deck, Scupper & Joint Repairs on Two Bridges over the MBTA Green Line & Keolis Commuter Rail Reconstruction of Deteriorated Bridge Barrier Curbing & Sidewalk MORE >
Services:Transit/Rail ConstructionStructures MaintenanceDemolitionBridge ConstructionHighway Construction
Location: Back Bay, Boston
Project Value: $7.3M
Owner: MassDOT & City of Boston
Overview:SPS successfully replaced the Mass Ave Bridge over Commonwealth Ave in Boston’s Back Bay using Rapid Bridge Replacement techniques, 30 hours ahead of schedule. The existing deficient bridge was replaced using Accelerated Bridge Construction techniques, including precast abutment caps, bridge units, and rapid setting concrete. MORE >
Services:Bridge Construction
Location: Logan International Airport
Project Value: $66M
Owner: Massachusetts Port Authority
Overview:Joint Venture with Bond Civil & Utility of Medford, MA. Demolition of the existing lower (Arrivals) level between Terminals A and C, and reconstruction of three new Arrivals level roadways. Reconstruction of the Terminal B parking garage exit roadway, construction of a new roadway from Terminal B arrivals level curbside pickup exit, and construction of MORE >
Location: Logan International Airport
Project Value: $34M
Owner: Massachusetts Port Authority
Overview:Reconstruction of the existing roadways to Terminal B passenger curbside pick-up and garage at both the upper (Departures) and lower (Arrivals) levels, including the main Terminal Area Roadways at both levels in advance of Terminal B. Reconstruction of the arrivals level entrance roadways and construction of one new underpass (tunnel) parallel to Terminal A, and MORE >
Location: Somerville, MA
Project Value: $34M
Owner: MassDOT
Overview:Project Overview: This preservation project is currently underway and is intended to preserve and extend the life span of the Interstate 93 Viaduct in Somerville, MA between Exit 21 and Temple Street. The project spans approximately one-half mile of I-93 and mainly consists of concrete rehabilitation of the substructure, structural steel repairs, structural steel cleaning MORE >
Services:Bridge Construction
Location: Boston, MA
Project Value: $22M
Owner: MBTA
Overview:Dorchester Avenue over the MBTA Red Line, Cabot Yard Spur, and Old Colony Main Line consists of replacement of the existing three-span highway bridge with a new, two-span precast reinforced concrete deck panel slab and cast in place closure pours, sidewalks and barriers, on weathering steel multi-girder superstructure. A new pile supported abutment will be MORE >
Location: Canton-Norwood-Westwood
Project Value: $45M
Owner: MassDOT
Overview:The project consists of widening Dedham St from a two lane roadway to four travel lanes (two in each direction), with a sidewalk and bike lanes, and constructing an off-ramp from I-95 NB to Dedham St. The project includes a full bridge replacement of Dedham St over I-95, bridge widening of the Dedham St bridge MORE >
Location: Boston, MA
Project Value: $16M
Owner: City of Boston
Overview:The scope of work includes full concrete bridge deck replacement of the Dalton St Bridge over I-90, MBTA, and Cambria Street in Boston MA in (2) two phases over a project duration of 18 months. Work includes: Demolition of concrete bridge deck Cleaning and painting of all structural steel girders Replacement of all bridge bearings MORE >
Services:Bridge ConstructionDemolition
Location: South Boston, MA
Project Value: $21.6M
Owner: Massport
Overview:The purpose of this Massport project was to create a dedicated freight corridor that would allow for the removal of container trucks serving Conley Terminal from residential streets, and to improve the operational efficiency of the terminal and the economic strength of the Port of Boston. MORE >
Location: Littleton, MA
Project Value: $36M
Owner: MassDOT
Overview:This interchange reconstruction project included six (6) bridge replacements with median crossovers including one temporary Acrow bridge. MORE >
Services:Bridge Construction